Standard Components For Plastic Mold 2021

COOLING UNITS

PIPES FOR COOLING UNIT

DCJK

DCJO (Outer pipe)

0 + 0.1

OUT Pipe Connection Part

IN Pipe Connection Part

- 0.1 0

D 1

R ( PT )

2

P

L

d

D

M Material STPG370 (Sch40)

DCJI (Inner pipe)

Outer Pipe (DCJO) Inner Pipe (DCJ I ) Insertion Part

d D

L

L

① Inside Core

② Cover Case

M Material SUS304

+ 0.1 0 + 0.1 0

6

■ Outer Pipe

+ 0.1 0 + 0.1 0

6

4

Inlay section Diameter D 1

Part Number

4

External diameter D

Internal diameter d

L 5mm increments

Applicable Cooling Units

R (PT)

Type

No.

1 2 3

DCJK1 DCJK2 DCJK3

8.9

10.5 13.8 17.3

7.1 9.4

1/8 1/4 3/8

10

DCJO

50—300

12.2 15.7

2

12.7

12

L 2

0 - 0.2

+ 0.2 0

L 1

3

C

C 1

3

L 1

■ Inner Pipe Applicable

Cooling unit components

Part Number

L 5mm increments

External diameter D

Internal diameter d

t

① Inside Core Brass (C3604)

② Cover Case Brass (C3604)

③ O–rings

④ O–rings

⑤ Socket Head Cap Screws

⑥ Set screw

Component name

Cooling Units

Type

No.

Fluoric rubber

Fluoric rubber

Stainless steel (SUS304)

Stainless steel (SUS304)

M Material

1 2 3

DCJK1 DCJK2 DCJK3

4 6 8

3 4 6

5

1

Applicable outer pipe

Outer pipe insertion part

Inner pipe insertion part

DCJI

50—300

Part Number

6

2

Applicable inner pipe

B C L

P

Hole diameter d 2

Inlay part diameter

Inlay diameter d

Depth

Depth

Type

No.

TYPE

Part Number – L DCJO 1 DCJI 2 – – 100 125

Quotation

Delivery

Order

1 2 3

DCJO 1 8.9 DCJO 2 12.2 DCJO 3 15.7

8.9

DCJI 1 DCJI 2 DCJI 3

4 6 8

24 1820 39 9

DCJK

2

14

12.2 15.7

21 23.5 40 27 30 42

25

10

OUT Pipe

IN Pipe

Detailed dimensions of components Part Number

E Use the outer pipe brazed to the cooling unit. Note the directionality of the inner pipes.

Example

⑤ Socket Head Cap Screws

① Inside Core

② Cover Case

Cooling Unit DCJK

⑥ Set screw

③ O-rings ④ O-rings

C 1

D d d 1

d 2

L 1

L 2

B C

Type

No.

B 1

Outer Pipe DCJO

1 151712 8.9 8 4 3326 1820

ORP 9

ORP 5 CBSS 3– 8 MSSU 3–3 ORP 6 CBSS 4– 8 MSSU 4–4 ORP 10 CBSS 5–10 MSSU 4–4

< Application Table > Cooling Units Outer Pipe Inner Pipe DCJK1 DCJO1 DCJI 1 DCJK2 DCJO2 DCJI 2 DCJK3 DCJO3 DCJI 3

Inner Pipe DCJI

DCJK

2 3

18 20 15 12.2 10 6 34 21 24 18 15.7 13 8 36

21 23.5 ORP 11

27

27 30

ORP 14

Part Number DCJK1

Quotation

Order

Delivery

■ How to Mount • Notch the end face of the inner pipe on the cooling unit side and fix it with set screws facing the cooling water outlet hole side. The inner pipe (DCJI) is notched as standard. • Install the outer pipe, inlet pipe, and outlet pipe by brazing. The end face of the welded side of the outer pipe should be processed to match the inner diameter of the fitting (inlay section processing) before installation. Inlay machining is performed as standard for outer pipe (DCJO). • After fixing the outer pipe to the cooling side, fix the inlet pipe and outlet pipe in the specified position and direction with the fixing bolts. • Be sure to apply grease to the O–ring to protect it during assembly.

1019

1020

E Do not use liquids other than cooling water.

Powered by